E-101 Scope sheet

Asbestos, lead, mold& tank removal

Hazardous materials have to be handled before a building comes down or gets renovated. QC Services removes them so the rest of the project can move forward safely.

ENV-01 · Hero photo

Sealed abatement containment area with warning signage

1600×1200 · 4:3 · eager

Straight answer

What is environmental remediation in demolition?

Environmental remediation is the removal or stabilization of hazardous materials, such as asbestos, lead paint, mold, contaminated soil and underground storage tanks, so a site is safe to demolish, renovate or rebuild. It usually comes before demolition, and doing both with one contractor keeps the schedule simple.

  • EPA Lead-Safe firm
  • In-house with demolition
  • LA · MS · AL · TX

Sheet E-101 · Scope

What's on this sheet

6 line items

  • E-101.1

    Asbestos abatement

    Removal of asbestos-containing materials before demolition or renovation.

  • E-101.2

    Lead stabilization & abatement

    Stabilizing or removing lead-based paint and lead hazards.

  • E-101.3

    Mold remediation

    Removing mold growth and affected materials after water damage.

  • E-101.4

    Soil remediation

    Addressing contaminated soil so a site can be redeveloped.

  • E-101.5

    UST removal

    Removing underground storage tanks from commercial and industrial sites.

  • E-101.6

    Hazardous material handling

    Safe handling of other regulated materials found on a project.

When to call

You need this when…

  • A survey found asbestos in a building scheduled for demolition
  • An older building with lead paint is being renovated
  • Water or storm damage has left mold behind
  • An old fuel tank is buried on a site that's being sold or redeveloped
  • Unexpected materials turned up in the middle of a job
ENV-02 · Project photo

Crew in protective suits removing materials inside containment

1200×1500 · 4:5 · lazy

Sequence

How the job runs

  1. 01

    Assessment

    We review existing surveys and the site conditions.

  2. 02

    Containment

    Work areas are set up to keep materials from spreading.

  3. 03

    Removal

    Hazardous materials are removed, stabilized or treated.

  4. 04

    Clear for demolition

    The site is ready for demolition or renovation to continue.

Straight answers

Environmental questions

Why does asbestos have to come out before demolition?

Demolishing a building disturbs everything in it. Regulated materials such as asbestos generally have to be identified and removed first so they are not released during demolition.

What does EPA Lead-Safe mean?

It means QC Services is certified under the EPA's Lead-Safe program (the Renovation, Repair and Painting rule) for firms that disturb lead-based paint in homes and child-occupied facilities built before 1978.

Do I need a survey before you start?

Most projects start with a survey of hazardous materials. If you already have one, send it with your bid request. If not, tell us and we'll discuss it on the walkthrough.

Can you remove an underground storage tank?

Yes. UST removal is one of our environmental services.

Can the same crew do the demolition afterward?

Yes. Environmental work and demolition are both done in-house, so one contractor can handle the whole sequence.

Found something hazardous on your project?